Asbestos Testing and Inspection in Burnsville

Typical cost in Burnsville

  • Testing a few materials, up to about 4 samples$300 – $600+
  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Asbestos survey before tearing down a house$800 – $2,000+
  • Survey of a small commercial or apartment building$1,500 – $4,000+

An old Burnsville ceiling, floor or wall can look exactly like a newer one and still hold asbestos. Testing settles it before a saw or scraper goes near the surface. Our part is booking an MDH-certified inspector and an accredited lab, then handing you a report with a result for each sampled material.

Our testing covers houses, townhomes, apartment buildings and commercial spaces. About 1 in 5 Burnsville homes sits in a building of 50 or more units, and we sample those as readily as a single house in Savage or Prior Lake.

Request a free quote
Entry of a 1970s split-level with small taped sample spots on the ceiling, wall and floor and sealed sample bags on a step

What we test

Sampling for a remodel

For a kitchen or bath remodel, the inspector takes material from what the work will touch, which might be the layers of flooring, the wall behind the cabinets or the texture on the ceiling. Should the plan grow by a room, the sampling grows with it.

Inspection before a teardown

Demolition calls for a full inspection by an MDH-certified inspector, and MPCA applies that to every structure. The inspector works through the entire building, roof and siding included, down to the lowest floor.

Lab analysis

Bulk analysis is done by a lab holding NIST NVLAP or AIHA accreditation. Watch the 1 percent mark on your results, since Minnesota law classes anything over it as asbestos-containing material.

Buildings from after October 1988

Burnsville’s median year built is 1982, several years ahead of an MDH cutoff. Only buildings completed after October 1988 can trade the inspection for a letter, signed by the architect or contractor, confirming no asbestos went into construction. Check your build date before you assume either way.

When testing is required

A homeowner planning a remodel in Minnesota isn’t bound by a general survey rule. The picture changes for employers, for public and commercial buildings and for results over the state limits, each covered below.

Crews with employees

Minnesota’s labor rules put this on the employer. Before a company’s workers begin demolition, remodeling or restoration in a place that may contain asbestos, a qualified person surveys the work area, and the employer keeps written proof that the survey was done.

Commercial and public buildings

The age of the building doesn’t matter here. Offices, shops and public buildings such as schools must have an asbestos inspection before renovation or demolition, even if they were built recently.

Results above the state line

Past the state’s size limits, friable asbestos becomes licensed-contractor work under MDH rules. A plumber, electrician or remodeler can’t take it out on the way to their own job, so an MDH-licensed asbestos contractor has to, unless an owner living in a single-family house does the work. MDH still strongly recommends a licensed contractor even then.

Labeled sample bags and a sampling tool next to a small cut in a floor

Results in hand? See popcorn ceiling removal, or go back to the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (952) 395-4632

Call (952) 395-4632